Customs Today
  • Home
  • Islamabad
  • Karachi
  • Lahore
  • National
  • Transfers and Postings
  • Chambers & Associations
  • Business
No Result
View All Result
Customs Today
  • Home
  • Islamabad
  • Karachi
  • Lahore
  • National
  • Transfers and Postings
  • Chambers & Associations
  • Business
No Result
View All Result
Customs Today
No Result
View All Result
Home Business

No work on Iran-Pak gas pipeline project started so far: Abbasi

byCT Report
26/03/2016
in Business
Share on FacebookShare on Twitter

ISLAMABAD: Federal Minister for Petroleum and Natural Resources Shahid Khaqan Abbasi has said that no work on Iran-Pakistan (IP) gas pipeline project had been started so far due to international sanctions against Iran.

The minister revealed this while briefing the Senate Standing Committee on Petroleum and Natural Resources, which met under the chairmanship of Senator Talha Mehmood. However, he added that the issue was on the agenda of the Iranian President’s ongoing visit to Pakistan.

You might also like

Bejaan Resorts, South Air sign agreement

28/08/2026

Petroleum Minister calls for review of gas subsidy system, pricing slabs

27/08/2026

Shahid Khaqan Abbasi said that about 100 million cubic feet per day (mmcfd) gas has been allocated for Khyber Pakhtunkhwa to generate electricity. The Private Power Infrastructure Board (PPIB) would have no role in installing gas-based power project in KP as per the request of the provincial government, he added.

Khaqan said that no gas pipeline project, including Liquefied Natural Gas (LNG) project, was part of China-Pakistan Economic Corridor (CPEC). China would construct an LNG pipeline from Gawadar to Nawabshah with a capacity to transport up to 1.2 billion cubic feet per day (BCFD) of LNG, but it was not a part of the CPEC, he added.

The minister said that Russia would build Karachi to Lahore LNG pipeline on Built Operate Transfer (BoT) basis with a cost of $2 billion, for which both the governments had signed an agreement and at present negotiations on the commercial agreement were under process.

Related Stories

Bejaan Resorts, South Air sign agreement

byCT Report
28/08/2026

ISLAMABAD: Bejaan Resorts and South Air (Private) Limited will formally enter into a strategic partnership aimed at strengthening air connectivity...

Petroleum Minister calls for review of gas subsidy system, pricing slabs

byCT Report
27/08/2026

ISLAMABAD: Federal Petroleum Minister Ali Pervaiz Malik has called for a review of the existing gas subsidy system and pricing...

Punjab moves to scrap old, unfit vehicles under new legal framework

byCT Report
25/08/2026

LAHORE: The Punjab government has introduced a new legal framework for scrapping old, unfit and polluting vehicles, declaring certain categories...

PIDE calls for collaboration to make Pakistan’s housing climate-resilient

byCT Report
24/08/2026

ISLAMABAD: Speakers at a PIDE dialogue here on Monday stressed the need to shift Pakistan’s housing agenda from policy commitments...

Next Post

Pakistan, Iran to boost bilateral cooperation

  • Terms and Conditions
  • Disclaimer

© 2011 Customs Today -World's first newspaper on customs. Customs Today.

No Result
View All Result
  • Transfers and Postings
  • Latest News
  • Karachi
  • Islamabad
  • Lahore
  • National
  • Chambers & Associations
  • Business
  • About Us

© 2011 Customs Today -World's first newspaper on customs. Customs Today.