Customs Today
  • Home
  • Islamabad
  • Karachi
  • Lahore
  • National
  • Transfers and Postings
  • Chambers & Associations
  • Business
No Result
View All Result
Customs Today
  • Home
  • Islamabad
  • Karachi
  • Lahore
  • National
  • Transfers and Postings
  • Chambers & Associations
  • Business
No Result
View All Result
Customs Today
No Result
View All Result
Home Breaking News

Neelum-Jhelum project unlikely to generate electricity before 2028

byCT Report
11/08/2026
in Breaking News, Business, Latest News
Share on FacebookShare on Twitter

ISLAMABAD: The Neelum-Jhelum Hydropower Project is unlikely to resume electricity generation before 2028, with repair work on the 979-megawatt facility expected to take another two years, according to sources in the Ministry of Water Resources.

The project, which was completed at a cost of Rs508 billion, has remained shut since 2024 after a fault halted its operations.

You might also like

FBR fails to recover Rs5.62b in taxes from 106 taxpayers

11/08/2026

Faheem Saigol stresses competitive access to Iranian market

11/08/2026

According to Ministry of Water Resources sources, the repair of the Neelum-Jhelum Hydropower Project is expected to continue for another two years.

Electricity generation from the facility is therefore likely to resume in 2028, once the required rehabilitation work has been completed.

The prolonged shutdown means the project will remain unavailable for several more years despite its massive investment and 979MW generation capacity.

Rs508bn project faces prolonged shutdown

The Neelum-Jhelum project was completed over a period of 18 years at a total cost of Rs508 billion.

Despite the huge expenditure and lengthy construction period, the project could not operate continuously for even four years before being shut down in 2024 because of a fault.

The latest repair timeline has raised concerns over the reliability and escalating costs associated with major hydropower projects.

A foreign company has been awarded a contract worth Rs35 billion to carry out repair work on the damaged project.

The rehabilitation is focused on the infrastructure affected by problems in the headrace tunnel, which plays a crucial role in carrying water toward the turbines.

According to the available information, debris had fallen over only around 20 metres of the 68-kilometre-long tunnel.

Sources said the debris has already been removed and the affected tunnel section has been cleaned and dried. However, the closure of the headrace tunnel stopped the flow of water toward the turbines, preventing the power plant from generating electricity.

The project therefore remains dependent on extensive repair and rehabilitation work before generation can restart.

Cause of tunnel problem remains unclear

One of the major unanswered questions is why the tunnel settled in the first place. The reasons behind the settlement have not yet been determined, according to the information provided by Ministry of Water Resources sources.

Until the cause is fully established and the necessary repairs are completed, the 979MW Neelum-Jhelum Hydropower Project is expected to remain out of operation.

The prolonged closure has renewed questions about the performance and cost-effectiveness of large hydropower projects.

The Neelum-Jhelum scheme took 18 years and Rs508 billion to complete, but its operational life has been disrupted by a major fault only a few years after becoming operational.

With another two years of repair work expected and a Rs35 billion rehabilitation contract already awarded, electricity generation from the project is now likely to remain suspended until 2028.

Related Stories

FBR fails to recover Rs5.62b in taxes from 106 taxpayers

byCT Report
11/08/2026

LAHORE: The Federal Board of Revenue has failed to recover Rs5.62 billion in taxes from 106 taxpayers across 14 field...

Faheem Saigol stresses competitive access to Iranian market

byCT Report
11/08/2026

LAHORE: Pakistan Industrial and Traders Associations Front (PIAF) Chairman and Lahore Chamber of Commerce and Industry (LCCI) President Faheem-ur-Rehman Saigol...

Roshan Digital Account inflows rise 52pc to $282m in July

byCT Report
11/08/2026

KARACHI: Investment inflows through Roshan Digital Accounts (RDAs) increased by 52% year-on-year to $282 million in July 2026, reflecting stronger...

SBP warns of major risks to Pakistan’s economy despite 4.5pc growth forecast

byCT Report
11/08/2026

KARACHI: The State Bank of Pakistan (SBP) has projected that the country’s economic growth will remain between 3.5% and 4.5%...

Next Post

Faheem Saigol stresses competitive access to Iranian market

  • Terms and Conditions
  • Disclaimer

© 2011 Customs Today -World's first newspaper on customs. Customs Today.

No Result
View All Result
  • Transfers and Postings
  • Latest News
  • Karachi
  • Islamabad
  • Lahore
  • National
  • Chambers & Associations
  • Business
  • About Us

© 2011 Customs Today -World's first newspaper on customs. Customs Today.