ISLAMABAD: A spokesman of government has made it confirm that 19,300 metric tons of petrol was supplied to petrol pumps across the country.
He said daily demand for petrol in the country is 12,000 metric tons. The spokesman said two oil shipments are likely to reach the country on the 25th and the 29th of this month.
Neelum-Jhelum project unlikely to generate electricity before 2028
ISLAMABAD: The Neelum-Jhelum Hydropower Project is unlikely to resume electricity generation before 2028, with repair work on the 979-megawatt facility...







