Customs Today
  • Home
  • Islamabad
  • Karachi
  • Lahore
  • National
  • Transfers and Postings
  • Chambers & Associations
  • Business
No Result
View All Result
Customs Today
  • Home
  • Islamabad
  • Karachi
  • Lahore
  • National
  • Transfers and Postings
  • Chambers & Associations
  • Business
No Result
View All Result
Customs Today
No Result
View All Result
Home International Customs

Tracker commissioning approaches at 20 MW California installation

byCustoms Today Report
03/10/2015
in International Customs, World Business
Share on FacebookShare on Twitter

LONDON: Tracker commissioning approaches at the 20 MW California installation. Array Technologies, Inc. has completed DuraTrack® HZ shipments to the 20 MW (ac) Maricopa West solar project for E.ON Solar, a subsidiary of E.ON SE, a global leader in energy solutions. Located in Kern County, California, the solar plant will benefit from reliable and proven performance of the DuraTrack HZ single-axis solar tracker, ensuring maximum onsite energy generation for the Maricopa West project.

To guarantee fast installation rates, ATI’s engineering team designed the DuraTrack HZ to efficiently mount the project’s 89,000 Jinko modules. In addition, ATI’s project management team has been operating hand-in-hand with E.ON to provide logistics and installation support throughout the three-month build. In order to ensure reliable performance and maximum uptime over 30 years, the flexibly linked tracker blocks have been configured to minimize the number of potential failure points per MW, such as motors and controllers.

You might also like

lamic banking assets reach Rs14.47 trillion, sector share rises to 23%

07/03/2026

Markets, oil drop in Asia but bitcoin edges towards $50,000

12/02/2021

“E.ON brings a long and successful history of renewable development, ownership and operational experience to the table,” said Thomas Conroy, president of Array Technologies. “We look forward to partnering with E.ON in the future to advance solar energy initiatives in the U.S. and around the world.”

The DuraTrack HZ tracking system at Maricopa West is slated to be commissioned as early as October with site interconnection scheduled shortly thereafter.

This isn’t E.ON’s first project with ATI’s DuraTrack HZ single-axis horizontal tracker. The two companies worked together on the 2 MW (ac) Alamo Solar Park, which E.ON recently sold to Dominion, one of the largest U.S. producers and transporters of energy. Alamo Solar Park is located near the town of Oro Grande, California, and was completed in 2014.

Tags: at 20 MWCalifornia installationTracker commissioning approaches

Related Stories

lamic banking assets reach Rs14.47 trillion, sector share rises to 23%

byCT Report
07/03/2026

KARACHI: Pakistan’s Islamic banking sector expanded during 2025, increasing its share in the country’s financial system with assets reaching nearly...

Markets, oil drop in Asia but bitcoin edges towards $50,000

byCT Report
12/02/2021

HONG KONG: Markets fell in Asia on Friday in holiday-thinned trade with investors awaiting developments in US stimulus talks, while...

Asia markets slip as dealers take breath in holiday-thinned trade

byCT Report
11/02/2021

HONG KONG: Asian equities pulled back on Thursday after a strong run-up in recent weeks as investors took a breather...

Asian markets push higher as traders focus on recovery outlook

byCT Report
10/02/2021

HONG KONG: Most Asian markets advanced again Wednesday as investors ignored a stall in Wall Street’s rally, with eyes firmly...

Next Post

How brain perceives social threat interactions?

  • Terms and Conditions
  • Disclaimer

© 2011 Customs Today -World's first newspaper on customs. Customs Today.

No Result
View All Result
  • Transfers and Postings
  • Latest News
  • Karachi
  • Islamabad
  • Lahore
  • National
  • Chambers & Associations
  • Business
  • About Us

© 2011 Customs Today -World's first newspaper on customs. Customs Today.