Customs Today
  • Home
  • Islamabad
  • Karachi
  • Lahore
  • National
  • Transfers and Postings
  • Chambers & Associations
  • Business
No Result
View All Result
Customs Today
  • Home
  • Islamabad
  • Karachi
  • Lahore
  • National
  • Transfers and Postings
  • Chambers & Associations
  • Business
No Result
View All Result
Customs Today
No Result
View All Result
Home Business

Wapda generates Rs100b thru sukuk for 969MW Neelum-Jhelum project

byCT Report
23/06/2016
in Business
Share on FacebookShare on Twitter

KARACHI: The Water and Power Development Authority (Wapda) has generated Rs100 billion from an Islamic bond for the development of 969-megawatt Neelum Jhelum hydropower project.

A consortium of 16 banks, led by the National Bank of Pakistan (NBP), agreed to fund the infrastructure corporate sukuk, based on diminishing Musharaka. The privately-placed sukuk with 10-year tenor was mandated in February.

You might also like

LNG prices decrease in Pakistan

29/08/2026

Bejaan Resorts, South Air sign agreement

28/08/2026

Neelum Jhelum Hydropower Company Pvt Limited (NJHPC) has entered into a financing agreement with the banks.

Wapda Chairman Zafar Mehmood, NBP President and Chief Executive Officer (CEO) Syed Iqbal Ashraf, Member Finance Anwarul Haq at Wapda and NJHPC CEO Lt Gen (R) Muhammad Zubair witnessed the signing ceremony.

A document from the lead arranger showed that the project set a profit rate for its sukuk of 113 basis points over the 6-month Karachi Interbank Offered Rate. The local currency sukuk, which carries a Pakistan’s government guarantee covering the issuance amount and profit payments, was given a preliminary AAA rating by credit rating agency JCR-VIS.

Infrastructure sukuk have been slow to appear, partly because they often require the transfer of assets into special purpose vehicles, which can be problematic for political or legislative reasons when it comes to large state projects.

The Neelum Jhelum hydropower project is the world’s first project and its infrastructure works are near 80 percent of completion. However, the project has yet to achieve a financial close. Located near Muzaffarabad in Azad Kashmir, the project is estimated to cost Rs404 billion, with 77 percent of that being financed through debts.

The project is an underground power generation facility being constructed on River Neelum in Azad Jammu and Kashmir. The project will annually generate 5.15 billion units of low cost electricity.

Related Stories

LNG prices decrease in Pakistan

byCT Report
29/08/2026

ISLAMABAD: The Oil and Gas Regulatory Authority (OGRA) on Saturday notified a significant reduction in liquefied natural gas (LNG) prices...

Bejaan Resorts, South Air sign agreement

byCT Report
28/08/2026

ISLAMABAD: Bejaan Resorts and South Air (Private) Limited will formally enter into a strategic partnership aimed at strengthening air connectivity...

Petroleum Minister calls for review of gas subsidy system, pricing slabs

byCT Report
27/08/2026

ISLAMABAD: Federal Petroleum Minister Ali Pervaiz Malik has called for a review of the existing gas subsidy system and pricing...

Punjab moves to scrap old, unfit vehicles under new legal framework

byCT Report
25/08/2026

LAHORE: The Punjab government has introduced a new legal framework for scrapping old, unfit and polluting vehicles, declaring certain categories...

Next Post

North Koreans study rocket science in India

  • Terms and Conditions
  • Disclaimer

© 2011 Customs Today -World's first newspaper on customs. Customs Today.

No Result
View All Result
  • Transfers and Postings
  • Latest News
  • Karachi
  • Islamabad
  • Lahore
  • National
  • Chambers & Associations
  • Business
  • About Us

© 2011 Customs Today -World's first newspaper on customs. Customs Today.