Customs Today
  • Home
  • Islamabad
  • Karachi
  • Lahore
  • National
  • Transfers and Postings
  • Chambers & Associations
  • Business
No Result
View All Result
Customs Today
  • Home
  • Islamabad
  • Karachi
  • Lahore
  • National
  • Transfers and Postings
  • Chambers & Associations
  • Business
No Result
View All Result
Customs Today
No Result
View All Result
Home Latest News

Oman’s Port of Salalah phase 3 expansion planned

byCustoms Today Report
11/09/2015
in Latest News
Share on FacebookShare on Twitter

MUSCAT: Three new container berths, new government berths, a dedicated cruise terminal, expanded breakwater arms, and a new approach channel will be constructed as a part of the Phase 3 expansion of Port of Salalah, it has been reported.

Billed as the largest upgrade since the port came into operation in 1998, the Phase 3 expansion is expected to cost “several hundred million dollars to implement”, Oman Daily Observer said.

You might also like

“Young entrepreneurs can reshape Pakistan’s economic future”

17/10/2026

NBP inks MoU with PowerChina arm for green financing collaboration

17/10/2026

According to officials, the most significant component of the upgrade is the expansion of the existing container terminal through the design and implementation of Quays 7, 8 and 9, each of about 450 metres in length and 500 metres wide.

The berths, which add a further 1,350 metres of quay wall to the port’s existing 2,500-metre-long quay length, will be equipped with the backland infrastructure to support modern, efficient container terminal operations.

The selected bidder will design and oversee the implementation of a roughly 3.7-kilometre-long North Breakwater whose primarily function is to protect the existing and future berths against long-wave energy responsible for moored vessel motion. Various new structures and facilities have also been planned for design and implementation as part of the Phase 3 expansion.

These include the construction of a 300-metre-long stub breakwater to be constructed perpendicular to the North Breakwater to protect the government and cruise berths against locally generated waves and other waves diffracting into the port from the harbour entrance.

The consultancy services contract calls for the design of new berths for tugboats and pilot boats, along with all other associated landside infrastructure, the report added. A marina for small crafts will also be designed at a suitable site chosen on the basis of a study to be carried out by the consultant.

Related Stories

“Young entrepreneurs can reshape Pakistan’s economic future”

byCT Report
17/10/2026

ISLAMABAD: The president of the Islamabad Chamber of Commerce and Industry has called for turning Pakistan's youth into a driver...

NBP inks MoU with PowerChina arm for green financing collaboration

byCT Report
17/10/2026

LAHORE: National Bank of Pakistan (NBP) has signed a Memorandum of Understanding (MoU) with PowerChina|Integrity Energy Storage (Shanghai) Technology Co....

FBR implements faceless tax audit and assessment system from October 15

byCT Report
17/10/2026

ISLAMABAD: The Federal Board of Revenue (FBR) has implemented a new framework for conducting tax audits, assessments and related proceedings...

Pakistan explores new funding options with three UAE Banks to ease debt pressure

byCT Report
17/10/2026

ISLAMABAD: Finance Minister Muhammad Aurangzeb held separate meetings with delegations from Sharjah Islamic Bank, Abu Dhabi Commercial Bank and Ajman...

Next Post

Port of Bronka to receive four STS cranes from LIebherr

  • Terms and Conditions
  • Disclaimer

© 2011 Customs Today -World's first newspaper on customs. Customs Today.

No Result
View All Result
  • Transfers and Postings
  • Latest News
  • Karachi
  • Islamabad
  • Lahore
  • National
  • Chambers & Associations
  • Business
  • About Us

© 2011 Customs Today -World's first newspaper on customs. Customs Today.