Customs Today
  • Home
  • Islamabad
  • Karachi
  • Lahore
  • National
  • Transfers and Postings
  • Chambers & Associations
  • Business
No Result
View All Result
Customs Today
  • Home
  • Islamabad
  • Karachi
  • Lahore
  • National
  • Transfers and Postings
  • Chambers & Associations
  • Business
No Result
View All Result
Customs Today
No Result
View All Result
Home Latest News

Oman’s Port of Salalah phase 3 expansion planned

byCustoms Today Report
11/09/2015
in Latest News
Share on FacebookShare on Twitter

MUSCAT: Three new container berths, new government berths, a dedicated cruise terminal, expanded breakwater arms, and a new approach channel will be constructed as a part of the Phase 3 expansion of Port of Salalah, it has been reported.

Billed as the largest upgrade since the port came into operation in 1998, the Phase 3 expansion is expected to cost “several hundred million dollars to implement”, Oman Daily Observer said.

You might also like

Nepra hikes electricity tariff by Rs2.37 for November bills

07/11/2026

Türkish envoy urges transformation of Pakistan ties into tangible economic benefits

07/11/2026

According to officials, the most significant component of the upgrade is the expansion of the existing container terminal through the design and implementation of Quays 7, 8 and 9, each of about 450 metres in length and 500 metres wide.

The berths, which add a further 1,350 metres of quay wall to the port’s existing 2,500-metre-long quay length, will be equipped with the backland infrastructure to support modern, efficient container terminal operations.

The selected bidder will design and oversee the implementation of a roughly 3.7-kilometre-long North Breakwater whose primarily function is to protect the existing and future berths against long-wave energy responsible for moored vessel motion. Various new structures and facilities have also been planned for design and implementation as part of the Phase 3 expansion.

These include the construction of a 300-metre-long stub breakwater to be constructed perpendicular to the North Breakwater to protect the government and cruise berths against locally generated waves and other waves diffracting into the port from the harbour entrance.

The consultancy services contract calls for the design of new berths for tugboats and pilot boats, along with all other associated landside infrastructure, the report added. A marina for small crafts will also be designed at a suitable site chosen on the basis of a study to be carried out by the consultant.

Related Stories

Nepra hikes electricity tariff by Rs2.37 for November bills

byCT Report
07/11/2026

ISLAMABAD: The National Electric Power Regulatory Authority (Nepra) has approved Rs2.37 per unit hike in electricity tariff under the monthly...

Türkish envoy urges transformation of Pakistan ties into tangible economic benefits

byCT Report
07/11/2026

ISLAMABAD: Ambassador of the Republic of Türkiye to Pakistan, Dr. İrfan Neziroğlu, has called for transforming the longstanding brotherly relations...

Gilgit-Baltistan launches online system for tax exemptions on Chinese imports

byCT Report
07/11/2026

GILGIT: Gilgit-Baltistan Chief Minister Amjad Hussain Azar has launched an online registration system allowing local traders to apply for tax...

Pakistan warns of AI cyberattacks on banks, power networks

byCT Report
07/11/2026

ISLAMABAD: The threat of artificial intelligence (AI)-powered cyberattacks against Pakistan’s financial institutions and critical infrastructure is increasing, prompting the National...

Next Post

Port of Bronka to receive four STS cranes from LIebherr

  • Terms and Conditions
  • Disclaimer

© 2011 Customs Today -World's first newspaper on customs. Customs Today.

No Result
View All Result
  • Transfers and Postings
  • Latest News
  • Karachi
  • Islamabad
  • Lahore
  • National
  • Chambers & Associations
  • Business
  • About Us

© 2011 Customs Today -World's first newspaper on customs. Customs Today.